Haiti’s Agriculture Minister Launches Irrigation Works in Torbeck

Haiti - Torbeck : Laying of the foundation stone for new hydro-agricultural infrastructure

Haiti’s Agriculture Minister Launches Irrigation Works in Torbeck

On Friday, November 20, 2026, Minister of Agriculture Marcelin Aubourg officially launched construction and rehabilitation work on irrigation systems in Périgny and Charlette, located in the commune of Torbeck. The works form part of the Irrigation Support Project in the South, known as PAIS, a 15-month initiative.

Project Scope and Goals

The PAIS project is designed to improve water access for more than 500 hectares of agricultural land. According to Minister Aubourg, the investments are intended to sustainably strengthen hydro-agricultural infrastructure, enable better management of water resources, support the growth of agricultural activities, and unlock the commune’s productive potential.

In his remarks at the foundation stone laying, Aubourg described the launch as the fulfillment of a commitment he had made during his time leading the Departmental Directorate of Agriculture for the South. He also stated that the works align with the vision of Prime Minister Fils-Aimé, which centers on providing long-term solutions to drought-related challenges. The Minister further emphasized the need to boost national production as a means of combating food insecurity, and reaffirmed his commitment to improving water access as a prerequisite for intensifying agricultural production and enhancing food security across the country.

Lot 1: Water Intake and Regulation Infrastructure

According to PAIS Coordinator and agronomist Jean Matus Lucien, the first lot of planned works focuses on the construction and rehabilitation of water intake and regulation infrastructure on the Torbeck River. The specific structures planned include:

  • A new reinforced concrete weir, 50 meters long
  • An 11-meter-wide dissipation basin
  • A sluice (scouring gate) equipped with a valve
  • An intake structure featuring two gated openings
  • A masonry desilting channel measuring 60 meters in length
  • A discharge structure with two gated openings, serving both the desilting channel and the dead-end section of the canal
  • Retaining walls and bank protection extending 50 meters along the left bank and 60 meters along the right bank
  • Gabion protection over a 50-linear-meter stretch downstream of the weir to stabilize the right bank and reduce erosion

Lot 2: Reconstruction of the Périgny Irrigation Network

The second lot concentrates on rebuilding and restoring the Périgny irrigation network itself. Key interventions under this component include:

  • Reconstruction of the dead-end (terminal) section of the canal over 150 meters
  • Renovation of various sections of the main canal between kilometer points 120 and 850
  • Lining of the upstream portion of the main canal
  • Construction of raised weirs and lateral intakes
  • Installation of crossing structures, communal washing areas, and watering troughs for livestock
  • Gabion protection along a 50-linear-meter stretch of the main canal to improve stability and durability

Overall Aims of the Combined Works

Through the two lots together, the Ministry of Agriculture aims to address both water-capture and water-regulation infrastructure alongside the distribution network. The stated goals are to improve irrigation conditions, secure hydro-agricultural facilities, and foster better utilization of agricultural land in the Périgny plain.

Source: www.haitilibre.com


Discover more from Irrigationtrends

Subscribe to get the latest posts sent to your email.

Leave a Reply

Your email address will not be published. Required fields are marked *