Winterizing Checklist for Center Pivots, Pumps and Main Lines

A free one-page checklist to winterize your irrigation system after harvest and before the first hard freeze. Print it, take it to the field and tick off each job, so no low point, closed valve or pump casing is left holding water.

One page, prints on both Letter and A4 paper.

Preview of the one-page Irrigationtrends winterizing checklist with tick boxes for center pivots, pumps, main lines, electrical and chemigation equipment

What is on the checklist

  • Before you shut down: catch-can test, a walk along the pivot, the flow meter reading and this season’s problems.
  • Center pivot or linear: draining, gearbox oil, drive lines, tires, emergency stop, wheel tracks and where to park.
  • Pump, well and main line: pump casing, low points, valves, gauges, engines and suction lines.
  • Electrical and chemigation: locking the control box, wiring, grounding and injection equipment.
  • Before you leave: a final walk of the whole system, covering openings against rodents and ordering parts.

The reasons behind each step, and the extra work for drip systems, engines and generators, are in the full guide: How to Winterize an Irrigation System: A Complete Checklist.

Get the next checklist

The spring start-up checklist for center pivots is already out, and the pump and well pre-season check comes next. Subscribe to the Irrigationtrends Weekly and each new checklist will be in your inbox as soon as it is ready. See all seasonal checklists.